Redesigning of Tehran–North Freeway Section II Axiom project page for Tehran–North Freeway Section II based on slide 9 of the uploaded PowerPoint. REDESIGNING OF TEHRAN–NORTH FREEWAY SECTION II 65 km Freeway Geometric Redesign, Tunnel Engineering, Bridge Design, Hydrological and Hydraulic Studies and Geotechnical Assessment Support CLIENT: Ministry of Road and Urban Development COUNTRY / YEAR: Iran / 2025 PROJECT TYPE: Road Design AXIOM ROLE: Freeway redesign, tunnel engineering, bridge design, hydrology/hydraulic review Axiom contributed to the Design and Supervision of Tehran–North Freeway Section II, a major 65 km multidisciplinary freeway infrastructure project connecting Tehran with the northern regions of Iran. The project required comprehensive engineering services across road design, tunnel engineering, bridge design, hydrology and hydraulic studies, geotechnical assessment, and construction-stage supervision. The consultancy services included freeway alignment review and optimization, geometric design, tunnel and bridge engineering coordination, hydrological and hydraulic assessment, drainage and flood-related design considerations, and geotechnical review of ground and slope conditions. The assignment also covered supervision during construction to ensure compliance with design specifications, quality control requirements, safety standards, and technical performance objectives. The project supported delivery of a strategic high- capacity corridor improving connectivity between Tehran and northern Iran. KEY SCOPE Tunnel engineering and tunnel interface review Bridge design and structural coordination Geometric design optimization Hydrology and hydraulic studies Drainage and flood-related design considerations Geotechnical assessment and protection strategy review Construction-stage supervision and quality control support Click images to view larger on this page AXIOM ENGINEERING EXCELLENCE

Redesigning of Tehran–North Freeway Section II

65 km Freeway Geometric Redesign, Tunnel Engineering, Bridge Design, Hydrological and Hydraulic Studies, Geotechnical Assessment, and Construction-Stage Technical Support

Axiom contributed to the Design and Supervision of Tehran–North Freeway Section II, a major 65 km multidisciplinary freeway infrastructure project connecting Tehran with the northern regions of Iran. The project required comprehensive engineering services across road design, tunnel engineering, bridge design, hydrology and hydraulic studies, geotechnical assessment, and construction-stage supervision.

The consultancy services included freeway alignment review and optimization, geometric design, tunnel and bridge engineering coordination, hydrological and hydraulic assessment, drainage and flood-related design considerations, and geotechnical review of ground and slope conditions. The assignment also covered supervision during construction to ensure compliance with design specifications, quality control requirements, safety standards, and technical performance objectives. The project supported delivery of a strategic high-capacity corridor improving connectivity between Tehran and northern Iran.

Redesigning of Tehran–North Freeway Section II visual 1 Redesigning of Tehran–North Freeway Section II visual 2
KEY SCOPE
  • Tunnel engineering and tunnel interface review
  • Bridge design and structural coordination
  • Geometric design optimization
  • Hydrology and hydraulic studies
  • Drainage and flood-related design considerations
  • Geotechnical assessment and protection strategy review
  • Construction-stage supervision and quality control support