Traffic Impact Study of Faraz Hotel Axiom project page for the Traffic Impact Study of Faraz Hotel based on slide 4 of the uploaded PowerPoint. TRAFFIC IMPACT STUDY OF FARAZ HOTEL Traffic Impact Assessment, Trip Generation and Distribution Analysis, Access Strategy Review, and Local Road Network Performance Evaluation CLIENT: JHS Investment Group COUNTRY / YEAR: Iran / 2026 PROJECT TYPE: Traffic Study AXIOM ROLE: Traffic impact assessment and access evaluation Axiom conducted a Traffic Impact Study for the Faraz Hotel development, a major mixed- use hospitality project with a total development area of approximately 210,000 sqm. The study was undertaken to evaluate the potential traffic impacts generated by the project and to assess its interaction with the surrounding road network, access points, and nearby intersections. The assessment focused on existing traffic conditions in the project vicinity, including traffic volumes, travel speeds, vehicle movement patterns, and access performance. It also included estimation of development-generated trips, evaluation of future traffic conditions, identification of potential congestion and accessibility issues, and preparation of practical traffic management and mitigation recommendations. KEY SCOPE Existing traffic condition assessment Traffic volume and movement pattern review Access and circulation assessment Road and intersection impact evaluation Congestion and accessibility issue identification Traffic management and mitigation recommendations Technical reporting to support traffic standard compliance Click images to view larger on this page AXIOM ENGINEERING EXCELLENCE

Traffic Impact Study of Faraz Hotel

Traffic Impact Assessment, Trip Generation and Distribution Analysis, Access Strategy Review, and Local Road Network Performance Evaluation

Axiom conducted a Traffic Impact Study for the Faraz Hotel development, a major mixed-use hospitality project with a total development area of approximately 210,000 sqm. The study was undertaken to evaluate the potential traffic impacts generated by the project and to assess its interaction with the surrounding road network, access points, and nearby intersections.

The assessment focused on existing traffic conditions in the project vicinity, including traffic volumes, travel speeds, vehicle movement patterns, and access performance. It also included estimation of development-generated trips, evaluation of future traffic conditions, identification of potential congestion and accessibility issues, and preparation of practical traffic management and mitigation recommendations.

Traffic Impact Study of Faraz Hotel visual 1 Traffic Impact Study of Faraz Hotel visual 2
KEY SCOPE
  • Existing traffic condition assessment
  • Traffic volume and movement pattern review
  • Access and circulation assessment
  • Road and intersection impact evaluation
  • Congestion and accessibility issue identification
  • Traffic management and mitigation recommendations
  • Technical reporting to support traffic standard compliance